Fairfax County, Virginia — concrete driveways, patios and stamped flatwork (571) 697-1011
Home › FAQ

Concrete Questions in Fairfax, VA

Cost, permits, thickness, timing and drainage — the questions that come up before a pour.

Concrete leveling in Fairfax
How much does a concrete driveway cost in Fairfax?

Published 2026 rates for Northern Virginia put a driveway at $8 to $18 per square foot in Fairfax County. A single-car 12 by 25 foot drive is quoted at $2,400 to $4,500, a double-car 20 by 30 foot drive at $4,800 to $9,000, and a 600 square foot two-car drive at $5,000 to $9,000 in broom finish or $9,000 to $15,000 stamped.

How long does a concrete driveway last here?

A properly based, properly jointed slab in this climate is a 25 to 30 year surface, provided the de-icing routine does not eat it. Most failures are base failures or thickness failures rather than age.

Do I need a permit to replace my driveway?

Replacing the same footprint usually does not need a building permit. Changing the width, the curb line, the apron or the drainage does, and in Fairfax County that review is Land Development Services on 703-222-0801. Inside the City of Fairfax it is City Code Administration on 703-385-7830, and in the Town of Herndon the town issues its own permits.

How deep should the base be?

Four to six inches of compacted stone under a residential drive, more where the subgrade is clay that holds water. The base is the part nobody sees and the part that decides whether the slab survives.

When is the best time of year to pour?

April to October is straightforward. A pour in the shoulder months needs a dry window and above-freezing nights; mid-winter pours are possible with blankets and accelerators, but they cost more and are harder to guarantee.

Can you pour in the rain?

A light drizzle during finishing is manageable; rain on a fresh surface before it has set ruins the finish. We watch the forecast and reschedule rather than gamble on the finish.

Will you haul away the old driveway?

Yes. Tear-out runs $2 to $5 per square foot on published Northern Virginia rates, and disposal of the old slab adds $500 to $2,000 depending on volume. It is itemised in the quote rather than bundled.

Do you work with homeowner associations?

Yes. Most subdivisions in Burke, Centreville and Reston have architectural guidelines covering driveway widening, colour and visible flatwork, and in Reston the Reston Association runs its own design review. We work to the approved plans.

What about drainage and stormwater rules?

Changing how water leaves the lot is part of the permit, not an afterthought. On lots that fall toward a neighbour or toward a county swale, the grading plan is settled before the pour.

Do you seal new concrete?

Not straight away. A new slab needs to cure, usually 28 days, before a sealer goes on. Sealing too early traps moisture and causes the surface to cloud.

Still have a question?

Call (571) 697-1011 Get a free quote
Call (571) 697-1011Get a quote